From 8 miles away?
Don't think so.
I just got berated for about a minute since the only obvious thing that I produced was a report close to a week ago.
And then the outstanding list of things, the incredible important stuff, the stuff needed for the meeting, the stuff that was fully impossible to generate a week ago, well, that, I then generated on demand with a couple of SQL queries.
While they waited. For them to walk into the meeting with.
I really hate being berated for pulling off the miraculous, when it starts out as just plain impossible, at least for the equipment and baseline tools available.