an S17A and S70. Forklift upgrade from the S17A to the S70. Both 32 Processor in one cabinet and 64GB of memory in two cabinets and a few cabinets of disk... a tape robot and cabinets of its media.
Sheeit man.
S70 took over an hour to start up, after a power transfer switch exploded and took all power out of the data center. The S70 had to do "checks"...
Anyway... that thing just cranked.